Steel rail wheels girder transpotation

Steel rail wheels girder transpotation

box girder
20-32m
Speed
250km-350km
Working grade :
A8
Transporting girder vehicle can transport 20m, 24m, 32m box-girder concrete girder for double track railway special line with speed 350km/h and 250km/h  for transport of passenger , from precast site to girder-erecting workstation via shortcut, roadbed, bridge (steel structure continuous girder and continuous girder with steel ,concrete integrated included),and culvert..
Product description
Certifications
Product description
Transporting girder vehicle can transport 20m, 24m, 32m box-girder concrete girder for double track railway special line with speed 350km/h and 250km/h  for transport of passenger , from precast site to girder-erecting workstation via shortcut, roadbed, bridge (steel structure continuous girder and continuous girder with steel ,concrete integrated included),and culvert , and complete relevant girder-erecting work with bridge girder erection machine .Girder transporter can carry bridge girder erection machine to transfer to another site in short distance between bridges, to pass twin track tunnel on railway special line for transport of passenger

Construction Process:

 
 
1.U beam precast yard
Do U type beam in the beam yard
  2.U beam precast yard
The precast u beam placed in the beam yard
 
3.Lifting beam
Put precast beam to the transporting girder car
  4.Transport
The transport car is transporting precast beam to the construction site
 
5.Girder erection
Using gantry crane lifting beam to pier
  6.Beam feeding
The car transport beam to beam launcher
 
7.Beam launcher
Trolley lifting the precast beam
  8.Beam launcher
The beam launcher setting on the beam
Certifications
inquiry